Chapter Fifty-Six*(2/2)
He came to formulate it. With the limited knowledge of some mechanical principles in his previous life, Gao Huaiyuan spent all his energy and racked his brains to draw a sketch of the waterwheel. As for the details, he was not good at it. How to improve it was left to his subordinates.
This group of craftsmen do it.
Fortunately, he now has craftsmen for all tasks. The carpenters are responsible for the waterwheel, the blacksmiths are responsible for the transmission, and the stonemasons are responsible for the foundation... In short, all those who have nothing to do are mobilized and put into the construction of the waterwheel.
Not to mention, Gao Huaiyuan himself had to admire the wisdom of these ancient craftsmen. He just made a sketch, and these craftsmen perfected all the details in three days, so as Gao Huaiyuan
Huaiyuan gave an order, and the Crouching Tiger Village became lively again. People were building dams, cutting rocks, and sawing wood. Zhou Laowu took on the role of central dispatch and was responsible for arranging these craftsmen to start work together.
.
The creek flowing through the yard was blocked and built into three dams in stages. Each dam can be equipped with a large water wheel to provide sufficient hydraulic driving force for Crouching Tiger Village. It may seem laborious, but as long as it is completed,
This can greatly improve the production efficiency here.
As soon as the waterwheel project here started, Gao Huaiyuan recruited Huang Zhen and gave him a secret mission to purchase some things needed for mining.
As for Huang Zhen's busy business of opening a store, he had to put it aside for the time being. Only after all the matters in Zhuangzi were completed, could he take off to do the work of opening a store. Huang Zhen also knew that Gao Huaiyuan would definitely do something big this time when he came back.
My heart is also full of expectations. I wonder what good things Gao Huaiyuan will come up with again after returning this time. Anyway, their goods are not worried about sales now, so it is not a big deal to slow down the opening of the store.
Huang Zhen simply put down other things at hand and acted as the purchasing director of Crouching Tiger Village. He started running around and being busy all day long, continuously transporting various materials and raw materials listed by Gao Huaiyuan back to Zhuangzi.
Suddenly there were more vehicles coming and going on the road leading to Crouching Tiger Village. It couldn't be said to be busy, but at least it was much livelier than before. Many people who came here to deliver goods for the first time suddenly came here.
Everyone was surprised to see such a large-scale villa popping up in a remote mountainous area.
The mining on the other side was also operating at the same time. In order to speed up the mining, Crouching Tiger Village alone would have to wait till the end of the year with the hands of the tenants. So after thinking about it again and again, Gao Huaiyuan ordered Xue Yan to come forward and take over from the tenants.
Among them, Gaojiazhuang summoned the labor of about 200 people, drove directly into the mountain, widened the original road, transported large sand and gravel to pave the road, and used stone rollers to crush it firmly, forming a road that could allow three people to walk side by side at the same time.
Chapter completed!