109, water pipe laying project
Wu Qingfeng, Liang Zhisheng and Wu Qingnian who came to watch the fun again, immediately smiled when he heard the shouts in the distance.
The pipe is too long and difficult to lay.
Wu Qingfeng and his team directly penetrated the entire apple orchard with nearly 6,000 meters of pipes. Then they considered the water pipes, because the apple trees were not easy to detour, and finally installed six sub-pipes with an average of one thousand meters, each sub-pipe piped in one area.
"How much does this hose cost per meter?" Wu Qingnian asked, kicking the green hose the size of a baby's arm beside his kick.
Wu Qingfeng said casually: "Three dollars per meter, because I bought more!"
“The price is OK!”
"But, brother, I don't think you can do this!" Wu Qingnian looked at the harsh water pump by the river, looked at the green pipe that could not be seen, shook his head and said.
"It's true!"
"It's so tiring!" Wu Qingfeng nodded. His clothes were sweating all over his body when he was shattered.
This is secondary!
The problem is that it is only less than a thousand acres. When the 20,000 acres of orchards are planted and the temporary water pipe is used, it will not be exhausted.
And it's very troublesome.
"Young man, have you ever known a plumber?"
"If you do temporary things like this, it will not only be troublesome, but also cost a lot."
The 12-inch gasoline pump, a second-hand one, also cost more than 6,000 yuan, and the pipeline was 12,000 meters, and it cost 36,000 yuan. It cost more than 40,000 yuan.
If the 20,000 acres of orchard is calculated like this, it will cost millions of watering temporarily, which is a bit expensive.
It is better to lay long-lasting water pipes in advance if you have millions of them.
"I'm going to start laying water pipes immediately. After the water pipes are laid, then plant trees!" Wu Qingfeng said.
"This is a solution!" Liang Zhisheng nodded after hearing this.
Although he has been working for two years, the orchards he has experienced have been planted, and the orchards are small and the watering facilities are not large.
He was also like Wu Qingfeng. The first thing he felt was that the orchard was too big, and there was no water pipe laying, and temporary watering was troublesome.
"But now that we have laid water pipes, we can only delay planting trees!"
"No need to delay, let's lay the main water pipe, the water pipe and the smaller split. No matter it, guide the water to the orchard first. Then, we will use manual watering first, but with the main water pipe line, it is much easier to water manually." Wu Qingfeng thought for a while and said.
In the 20,000-acre orchard, the main water pipe must not be like temporary water pipes. In order to ensure the service life, three-type polypropylene pipes such as PPR must be used. This pipe is lightweight, corrosion-resistant, non-scaling, and has a long service life.
Moreover, in order to have sufficient water volume, Wu Qingfeng estimated that he would need at least DN80, that is, a pipe with an inner diameter of more than 8 cm.
Of course, you have to ask a professional plumber for details on how much this is used and then draw a conclusion.
"Do you want to outsource?" Wu Qingnian looked at Wu Qingfeng after hearing this.
Wu Qingfeng nodded. The water pipe laying of 20,000 acres of orchard is not a small project. It is best to find a small team that specializes in dry water pipe laying.
"Brother, I think it's better not to outsource. These outsourcing teams are expensive, and they are a bit unreliable. They waste materials and streamline processes at will.
It is better to find a few more trustworthy plumbers and let’s watch it ourselves!
In this case, we will give a normal wage, and whether it is OK or not, let us know whether it is OK. If not, let him get out and find someone again!” Wu Qingnian thought for a while and said.
"You said that, do you have someone in your hands?" Wu Qingfeng asked with a smile.
He wants to outsource, mainly because he thinks that overall outsourcing is not troublesome.
However, what Wu Qingnian said makes sense. Outsourcing must be much more expensive than finding someone himself. Although it cannot be reviewed much, if there is someone, I still want to find someone to do it, even if the personal wage is slightly higher.
Moreover, as Wu Qingnian said, there are many outsourcing teams now that there are many unreliable materials and time is wasted, so the work is worse than that.
"Brother, what am I doing when you ask?"
"Contractor!"
"The plumbers have known each other so much!" Wu Qingnian said with a smile.
"Then, how about the work package for the orchard water pipe laying? The old price!" Wu Qingfeng thought for a while and said.
When Wu Qingnian heard this, he was stunned and then felt a little moved, but after thinking about it, he still shook his head.
How to say it? Once he packed it up, what he said before was nonsense.
Because he took the bag, my cousin calculated according to the old price, so it was no different from my cousin laying orchard water pipes outsourcing.
The only difference is that if you outsource it to others, the money will be earned by others. If you consign it to him, the money will be earned by him.
However, he suggested that he was looking for someone to work for him just to save money for his cousin. If he took it, wouldn’t this be just to contract for him?
Although, after contracting, it is easy to make money for a few tens of thousands of yuan!
But Wu Qingnian thought about it slightly and gave up!
For the sake of tens of thousands of yuan, my cousin thought he was a profit-seeking person, and he felt it was not worth it.
Because he always feels that his cousin Wu Qingfeng is a person who does big things. He follows the other party and makes some money and makes some love without money, but he cannot waste the love he has finally made for small profits.
Moreover, his cousin Wu Qingfeng did not treat him badly, and even made him more profitable than the previous contracted projects in the feeder.
"Forget it, brother, forget it. I know some reliable plumbers and electricians. I will call to ask later to see who has time and is willing to do it!" Wu Qingnian said, then looked at Liang Zhisheng beside Wu Qingfeng and smiled: "In addition, just let Dr. Liang look at him. The person in charge of the orchard must have certain ideas about laying water pipes. After all, the water pipes will be laid as convenient as the orchard is managed in the future."
Wu Qingfeng then looked at Liang Zhisheng.
When Liang Zhisheng saw Wu Qingnian kicking him a bag for no reason, he immediately wanted to curse himself, because he always felt that Wu Qingnian had a feeling of scrutiny and questioning every time he saw him.
This made him very uncomfortable and dissatisfied.
Of course, he could only bear it. Wu Qingnian is his boss's cousin, so what if he doesn't agree?
"Mr. Wu, Mr. Nian is right. How to lay the water pipe? I will go back tonight to study it and give a reasonable laying line planning map as soon as possible." Liang Zhisheng thought for a while and said.
His boss looked at him, obviously he wanted to catch him, and he was not stupid.
What's more, Wu Qingnian was right. The laying of orchard water pipes is indeed related to orchard management in the future, and it is indeed one of the issues he should consider.
"Then I'll trouble Lao Liang!"
Upon hearing this, Wu Qingfeng smiled and patted Liang Zhisheng on the shoulder.
In fact, he also felt that this kind of thing should be won by Liang, because water pipe laying is also a very important item in agriculture.
Modern agriculture has nothing but three elements: seeds, fertilizers, and water conservancy.
Chapter completed!